Description
Profitap 40G Bypass TAP helps maintain network connectivity when an in-line security or performance appliance becomes unavailable. It monitors the appliance path with heartbeat traffic and can bypass the tool when the configured failure condition is detected.
On this page
Profitap 40G Bypass TAP technical highlights
| Manufacturer model | F1-40G-BP |
|---|---|
| Link arrangement | One 40G link |
| Health monitoring | Heartbeat-based checks |
| Recovery path | Automatic bypass when the tool is unavailable |
| Maintenance | Bypass workflow for planned service activities |
Choosing Profitap 40G Bypass TAP
A 40G link needs a matching bypass and optical configuration. Confirm the exact interface standard at the network and tool connections, then define the heartbeat and manual-maintenance workflow.
Agree the failure policy
Define what should happen when the appliance stops forwarding, loses power or is taken out of service. Set a heartbeat policy that detects the relevant fault and document the restoration procedure. Test the transition during a controlled change window. Record that traffic may continue without inspection while the tool is bypassed, and agree how that state will be monitored.
Profitap 40G Bypass TAP questions
Does bypass preserve security inspection during an appliance failure?
Bypass preserves the traffic path by taking the unavailable appliance out of that path. Its inspection is then absent, so the fail-open policy must be agreed with the network and security teams before deployment.
What information helps Norrati prepare a quotation?
Send the intended link or capture arrangement, interface types, quantities and deployment country. Include existing equipment that must work with the product and any required accessories or licences. This helps check the proposed configuration before confirming availability, lead time and commercial terms.
Discuss Profitap 40G Bypass TAP with Norrati
Contact Norrati International in Dubai to review your project requirements. Confirm the exact ordering reference, included items and applicable support in the final quotation.



